Main Site Command
Active Project Block B
Online Applicant Inbox & CV Desk
Real-time candidate submissions from the Careers Portal & QR Code.
Onboard Worker or Professional
Requirements & Scope Guide
Select a role from the Onboarding Desk to view its required credentials and standard scope of work.
Workers Masterlist & Contact Directory
0 Active Cards| ID Number | Name | Designation | Personal Contact | Emergency Contact Person | Emergency Contact Info | Actions |
|---|
Technical Managers & Emergency Contacts
⚠️ **Availability Protocol:** Legally and operationally mandated under COSH standard guidelines, site managers must maintain active, 24/7 connectivity for emergency response, coordinate safety, or verify dispatches at all times.
| Personnel | Role | Mobile Contacts | Operational Shift | Coordination Status |
|---|
Subcontractor Qualification Directory
Qualified subcontractors must present a valid PCAB license, minimum 50% NC-II certified crew ratio, and maintain >= 90% safety track rating.
| Subcontractor Team | Trade Specialty | PCAB Grade | NC-II Certified Ratio | Safety Index Score | Legal Bond Status | Incentives Active |
|---|
Add Subcontractor Accreditation
Active Site Clock-in & Verification Feed
| User ID | Active Site | Action | Method | Coordinates / Code | Check-in Time |
|---|
Canteen & Grocery Deductions
Tracks payroll deductions for food, grocery, and other site store purchases. Updates dynamically when workers place orders.
| Worker ID | Worker Name | Item / Request | Qty | Total Price | Order Date | Deduction Status |
|---|
Driver Summary Reports
0 ReportsAutomatically tracked and synced check-in / check-out activities, verified material checklists, and recipient proof of handovers per site arrival and departure.
| Driver Info | Vehicle Info | Site / Location | Arrival / Departure | Checklist Verified | Receiver Proof | Submitted At |
|---|
Workers Bulletin & Performance Rewards
Welcome to the performance and retention management command center. We implement standard construction scheduling alongside the gamified 3P Salary & Bonus Formula (Basic + Capability + Performance) to boost productivity, guarantee safety, and retain top talent through monthly and quarterly bonuses.
Workers Performance & Capabilities Evaluation Chart
| Rank & Worker | Position | Performance (Att / Wrk / Attd) | Capabilities (Gro / Crd / Str) | Overall Rating | Action |
|---|
Active Rewards & Advocacy Panel
Daily Compensation & Reward Structure
NCR Minimum Wage (DOLE-compliant guaranteed base)
| Position | Premium | Total Rate |
|---|---|---|
| Helper | + ₱0.00 | ₱670.00 |
| Skilled C | + ₱50.00 | ₱720.00 |
| Skilled B | + ₱75.00 | ₱745.00 |
| Skilled A | + ₱100.00 | ₱770.00 |
| Foreman | + ₱150.00 | ₱820.00 |
| General Foreman | + ₱250.00 | ₱920.00 |
Advocate & Milestone Payouts
Name: Loading...
Loading...
Loading...
Site: Loading...
Loading...
Bonus: Loading...
Worker: Loading...
Loading...
Bonus: Loading...
Worker: Loading...
Loading...
Bonus: Loading...
Worker Payroll Calculator
Admin & Tech Staff Compliance Auditor
Auditing the non-negotiable compliance rule: "No AI-RAS App Usage = No ₱3,000 Bonus qualification".
| Admin & Tech Position | Mandatory AI-RAS Compliance Requirement | Compliance Task Met? | App Usage Logs | Eligibility Status | Performance Bonus |
|---|
Project Payroll & Cost Vault
Confidential site labor payouts, wage slips, materials receipts & overhead vouchers segregated from public client gallery.
| Date / Period | Project / Site | Cost Center | Payee / Details / Worker Payout | Amount (₱) | Proof / Slip |
|---|---|---|---|---|---|
|
Loading encrypted financial records from Cloudflare KV...
|
|||||