Active Session 89:59
ArkiPerks Studio Logo
Partner Lounge: Niji & Co - Bakes & Coffee

Sip Coffee.
Design Your Dream Home.

Enter the access code printed on your receipt to unlock 90 minutes of VIP access to the AI-RAS architectural estimator and material planner.

⚔ Sample Receipt Vouchers (Try Click):
Don't have a receipt? Try a 15-Minute Free Guest Pass
ArkiPerks Studio Logo

Welcome to the ArkiPerks Studio ā˜•šŸ“

Sketch your floorplan, compute construction budgets, and lock in Kingsrock direct warehouse material rates.

High-Speed Lounge Wi-Fi Verified

Project Parameters

Step 1 of 2
šŸ” 2-Storey Modern Single detached residential
ā˜• Cafe / Store Fitout Commercial boutique space
šŸ³ Kitchen & Bath Remodel Cabinetry, tiles & plumbing
🧱 G-Wall Precast Extension Fast-erect room addition
120 sqm
20 sqm (Studio / Nook) 200 sqm 400 sqm (Mansion)
Standard ₱18,500/sqm
Semi-Elegant ₱24,000/sqm
High-End Luxury ₱32,000/sqm

Live Construction Estimate

ā— Verified Pricing
Total Estimated Turnkey Budget ₱2,880,000 Target Duration: 4.5 Months
Labor & Site Execution (35%): ₱1,008,000
Structural & Finishing Materials (60%): ₱1,728,000
Permits, Plans & Contingency (5%): ₱144,000
Kingsrock Material Supply (Direct Depot) 5% Cafe Lounge Discount
Portland Cement (40kg)
840 Bags
Deformed Steel Rebar (10mm/12mm)
1,320 Pcs
Kingsrock G-Wall Precast Panels
480 Panels
Porcelain Floor & Wall Tiles
140 Boxes
Washed Sand & 3/4 Gravel
14 Truckloads
6-Month Cloud Storage Guaranteed Leave the cafe anytime! Your project is preserved under Code: ARKI-7721.
Interactive Studio

AI Design Studio — Sip, Sketch & Visualize

Fullscreen 3D Portal

Drafting your dream renovation or new home over your favorite coffee? Pick an architectural aesthetic, customize your space layout, and generate high-resolution design prompts or explore 3D BIM models live.

AI-RAS Prompt & Blueprint Spec
Architectural visualization of a Modern Tropical Minimalist with timber louvers and lush foliage, focusing on 2-Storey 3-Bedroom Villa with double-height ceiling living room, illuminated by Warm golden hour sunlight filtering through floor-to-ceiling glass, 8k resolution, photorealistic, built with Kingsrock precast G-Wall construction.
Interactive 3D Floorplan & BIM Sandbox
Click & Drag to Orbit 3D Open Fullscreen

Kingsrock Direct Supply Chain

Central Depot: Kawit, Cavite

Because you are drafting this inside our partner cafe, you get Wholesale Contractor Pricing directly from Kingsrock Construction's central supply network without retail middlemen markups.

PRECAST WALL SYSTEM
Kingsrock G-Wall

Fireproof, lightweight cellular concrete wall panels that cut erection labor by 40%.

₱520 / panel (SRP ₱650)
CEMENT & BINDERS
Holcim / Republic Cement

Direct mill pallet deliveries for high-density structural pours.

₱225 / bag (SRP ₱245)
STEEL REBARS
Grade 40 Deformed Rebar

PNS 49 certified high-tensile steel bars bundled and delivered to site.

₱210 / pc (SRP ₱235)

Partner Cafe Specials & Session Extenders

+30m to +60m per item

Need more time to finalize your blueprints? Order any of these artisan items at the counter to automatically add extra time to your ArkiPerks session!

Iced Spanish Latte Adds +45 Mins
₱175
Almond Butter Croissant Adds +30 Mins
₱145
Architect's Power Combo Adds +90 Mins (Best Value)
₱295

Cloud Project Vault

Preserved for 6 Months
Enjoying AI-RAS while sipping coffee at our partner cafe?

Your cafe receipt unlocks 90 mins of AI engineering tools. Order another coffee or meal for +60 mins, or purchase Kingsrock Depot materials to unlock 30-Day VIP Project Access!

Private Customer Workspace šŸ” 2-Storey Modern 120 sqm

My Dream Villa at Kawit

Real-time cashflow planner for your personal build. Categorized into upcoming committed milestones, ongoing work-in-progress, and settled payments.

Project Budget Allocation Meter: Total Committed: ₱0.00 / Target Budget: ₱2,880,000.00 (0%)
Completed (Paid): ₱0.00 Ongoing (WIP): ₱0.00 Upcoming (Next): ₱0.00
Upcoming Expenses Planned / Next
₱1,152,000.00
Finishing, Glazing, Sanitary Fixtures & Handover
Ongoing Expenses Active WIP
₱1,008,000.00
Foundation Pouring, G-Wall Panels & Roughing-in
Completed Expenses Paid / Settled
₱720,000.00
Architectural Plans, Permits, Site Clearing & Deposit
Notification message